销售电话:02036528890

Address: 18 Dongzhou Avenue, Xintang Town, Zengcheng District, Guangzhou

Address: Liuge Village, Dacheng County, Langfang City, Hebei Province

COMMITTED TO NEW ENERGY-SAVING BUILDING PANELS

 

The company is mainly committed to the production, R&D and market sales of new energy-saving building panels. It has introduced a fully automated continuous panel production line with leading domestic standards, as well as a variety of heat preservation production equipment. 

E-mail:gzhna@126.com

 

Contact:15112111151

Rubber and plastic sales: 0316-3526888   

Rock wool sale: 0316-3536888   

Glass cotton sales: 0316-3529888

Mobile website

.

Copyright © 2015 Hebei Furnice New Building Materials Co., Ltd.  ICP15102409  Powered by: www.300.cn  guangzhou.300.cn

Rock wool board construction essentials

Classification:
Product description
Source:
2018/12/13 10:41
[Abstract]:
Before construction, special construction plans for energy-saving and heat-insulation for engineering projects shall be prepared according to...
Rockwool exterior insulation system:
 
1. Before construction, special construction plans for energy-saving and heat-insulation for engineering projects shall be prepared according to the design and requirements of this regulation and relevant technical standards, and technical personnel shall be provided for technical delivery and professional technical training. 
 
2. The construction of the rock wool off-board insulation system for energy-saving insulation project shall be carried out in accordance with the approved construction drawing design documents and the approved energy-saving insulation construction plan for the project.
 
3. The production enterprises of rock wool off-board insulation system should have on-site guidance during the construction process, and cooperate with the construction unit and site supervision to do construction quality control work.
 
4. Materials entering the site must be inspected according to specifications, quantity and quality requirements before they can be put into storage, and should be kept by special personnel. It is strictly prohibited to stack in the open air. Curtain wall rock wool board should be stacked for anti-moisture
 
5. Construction should have the following conditions
(1) The treatment of the stratified layer of the base wall and its cement mortar and the installation of the embedded parts are completed.
(2) The necessary construction machinery and labor protection supplies should be prepared.